北京酒店標(biāo)識(shí)招標(biāo)初步評(píng)審項(xiàng)目需求一覽表及說(shuō)明
上述情形之一的,為未能對(duì)招標(biāo)文件做出實(shí)質(zhì)性響應(yīng)的投標(biāo),并作廢標(biāo)處理。
19.11 細(xì)微偏差是指投標(biāo)實(shí)質(zhì)上響應(yīng)了招標(biāo)文件要求,但在個(gè)別地方存在漏項(xiàng)或者提供了不完整的數(shù)據(jù)等情況,并且補(bǔ)正這些遺漏或不完整不會(huì)對(duì)其他投標(biāo)人造成不公平的結(jié)果。北京酒店標(biāo)識(shí)細(xì)微偏差不影響投標(biāo)文件的有效性。評(píng)標(biāo)委員會(huì)應(yīng)當(dāng)要求存在細(xì)小偏差的投標(biāo)人在評(píng)標(biāo)結(jié)束前以書(shū)面形式予以補(bǔ)正。拒絕補(bǔ)正
20.3 根據(jù)綜合評(píng)分法完成評(píng)標(biāo)后,評(píng)標(biāo)委員會(huì)應(yīng)當(dāng)擬定一份書(shū)面評(píng)標(biāo)報(bào)告提交招標(biāo)方。評(píng)標(biāo)報(bào)告應(yīng)當(dāng)載明投標(biāo)人的投標(biāo)項(xiàng)目、所作的任何修正、對(duì)商業(yè)偏差的調(diào)整、對(duì)技術(shù)偏差的調(diào)整、
對(duì)各評(píng)審因素的評(píng)估以及對(duì)每一投標(biāo)的最終評(píng)審結(jié)果。
2 本次評(píng)標(biāo)和定標(biāo)一般應(yīng)當(dāng)在開(kāi)標(biāo)后7 個(gè)工作日內(nèi)完成,不能在開(kāi)標(biāo)后 7 個(gè)工作日內(nèi)完成評(píng)標(biāo)和定標(biāo)的,招標(biāo)人應(yīng)當(dāng)提前3 天通知所有投標(biāo)人延長(zhǎng)投標(biāo)有效期。
21. 評(píng)分標(biāo)準(zhǔn)
第七章、定 標(biāo)
21、定標(biāo)標(biāo)準(zhǔn)
21.1 合同將授予被確定為實(shí)質(zhì)上響應(yīng)招標(biāo)文件要求,經(jīng)評(píng)定認(rèn)為具備履行合同能力、報(bào)價(jià)合理、續(xù)后服務(wù)和相關(guān)培訓(xùn)條件都符合招標(biāo)文件要求的、得分最高的投標(biāo)方。采用綜合評(píng)分法的,按評(píng)審后得分由高到低順序排列。得分相同的,按投標(biāo)報(bào)價(jià)由低到高順序排列。得分且投 標(biāo)報(bào)價(jià)相同的,按技術(shù)指標(biāo)優(yōu)劣順序排列。
1 最低投標(biāo)價(jià)不一定是被授予合同的保證。
2 如果確定該投標(biāo)方無(wú)條件圓滿履行合同,招標(biāo)方將按照投標(biāo)方的得分高低把合同授予
下一個(gè)中標(biāo)候選人。22、接受和拒絕任何或所有投標(biāo)的權(quán)力
第四部分項(xiàng)目需求一覽表及說(shuō)明
比 第一次比稿費(fèi) 報(bào)價(jià): 人民幣大寫(xiě):
稿 第二次比稿費(fèi) 報(bào)價(jià): 人民幣大寫(xiě):
期 第三次比稿費(fèi) 報(bào)價(jià): 人民幣大寫(xiě):
中標(biāo),將免除比稿費(fèi)
是
否
合 項(xiàng)目需求 X VIS 基礎(chǔ)要素設(shè)計(jì)
同 Y VIS 應(yīng)用要素設(shè)計(jì)
期 Z 標(biāo)識(shí)系統(tǒng)設(shè)計(jì)
[ 聲音識(shí)別系統(tǒng)
\ 感官及形象識(shí)別系統(tǒng)
五星級(jí)尊茂 報(bào)價(jià): 人民幣大寫(xiě):
四星級(jí)悅茂 報(bào)價(jià): 人民幣大寫(xiě):
四星級(jí)知/、 報(bào)價(jià): 人民幣大寫(xiě):
Hotels initial assessment identifies the tender list and description of project requirements
These circumstances, the failure to make a substantive response to the tender documents the tender void standard treatment.
19.11 subtle bias is essentially the response of the tender documents the tender requirements, but in some places there are omissions or provided incomplete data, etc., and the correction of these missing or incomplete will not be unfair to other bidders of the results. Slight deviation does not affect the validity of the tender documents. Evaluation committee should require the existence of small deviation of the bidders in the evaluation shall be in writing before the end of correction. Refused to make corrections
20.3 According to the General score after completion of evaluation, the evaluation committee shall prepare a written evaluation report to the tender side. Evaluation report shall contain the bidder's tender, any amendments made, the adjustment of commercial bias, bias of technical adjustments,
Factors for the assessment of each tender assessment and final assessment results.
2 times the evaluation and calibration in general should be opening within seven working days after completion, not after the opening seven working days to complete the evaluation and calibration, the tender should be at least 3 days notice for all bidders to extend the bid validity period.
21. Grading
Chapter VII, calibration
21, calibration standards
21.1 Contracts will be awarded is determined to substantially respond to the tender documents, the assessment considered to have the ability to perform the contract, price reasonable, continued after the service conditions and related training requirements of the tender documents, the highest score bidders. Integrated rate law, after review by descending score order. Score the same, according to the tender offer from low to high order. The same score and the tender offer, according to technical indicators in order of merits.
1 being the lowest bid is not necessarily a guarantee of contract award.
2 If it is determined that the unconditionally successful bidder to perform the contract, the tender side will score low bidder in accordance with the contract award
The next successful candidate. 22, accept and reject any or all of the power of tender
The fourth part of the list and description of project requirements
Attained during the royalties than the first offer: RMB capital:
Issued on the second level attained royalties Price: RMB capital:
Attained during the third period royalties Price: RMB capital:
Successful, will be exempt from royalties than?? 是?? No
Together basic elements of the project design needs X VIS
Application of elements of design with Y VIS
Identification system design phase Z
[Voice recognition system
\ Sensory and image recognition system
Star Mao statue Price: RMB capital:
Four-star Yue Mao Price: RMB capital:
Four-star know /, Price: RMB capital:
(版權(quán)所有:轉(zhuǎn)載請(qǐng)注明來(lái)源于【人和時(shí)代?中國(guó)】 http://16yxy.com 作者:先鋒)
【人和時(shí)代?中國(guó)】國(guó)際級(jí)概念vi策劃設(shè)計(jì)印刷一體化,專業(yè)為您點(diǎn)亮個(gè)性化企業(yè)vi設(shè)計(jì)之路!
――源自臺(tái)灣專業(yè)vi設(shè)計(jì)印刷執(zhí)行專家
――源自臺(tái)灣專業(yè)vi設(shè)計(jì)創(chuàng)意設(shè)計(jì)公司
――國(guó)際級(jí)概念、專業(yè)針對(duì)企業(yè)vi品牌策劃、CIS系統(tǒng)規(guī)劃、設(shè)計(jì)、導(dǎo)入、執(zhí)行專家!
――品牌設(shè)計(jì)(顧問(wèn))策劃、標(biāo)志設(shè)計(jì)(LOGO)、vi設(shè)計(jì)、酒店VI設(shè)計(jì)、精裝畫(huà)冊(cè)設(shè)計(jì)、品牌(CIS)整合,企業(yè)廣告宣傳設(shè)計(jì)制作、印刷等一整套的服務(wù),是您長(zhǎng)期跟蹤合作商。
企業(yè)VI設(shè)計(jì)網(wǎng)( http://www.rhtimes.com )
酒店VI設(shè)計(jì)網(wǎng)( http://16yxy.com )
國(guó)際CI網(wǎng)( http://www.brandcis.com )
品牌整合→人和時(shí)代將是您先擇最佳的品牌cis整合策劃設(shè)計(jì)(顧問(wèn))合作商!
我們相信→創(chuàng)意就是力量,誠(chéng)信締造美好未來(lái)…